Projek Bekalan Elektrik Luar Bandar (BELB) Talian Grid Negeri Sarawak Tahun 2011-2012 Berasaskan Kaedah Reka dan Bina (Mukah) -RES 2November 18, 2014Projek Bekalan Air Pusa Fasa II (Sambungan Bekalan Air Dari Simpang Jalan Kaki Wong Ke Pusa-Beladin, Betong)September 11, 2014 Show all at September 11, 2014 Categories Water Supply DateSeptember 11, 2014 Proposed off-River Bario Raw Water Storage Pond & Water Reticulation at Kampung Baru, Bario,Sarawak (Design & Build) Share Related postsNovember 18, 2024Projek Bekalan Air Luar Bandar (Balb) Bau/ Lundu/ Sematan, Bahagian Kuching, Sarawak (Kejuruteraan Mekanikal Dan Elektrikal)Read more